What must an inspector check at a final inspection?

  1. Compliance with all applicable codes

  2. Quality of construction materials

  3. Payment of permit fees

  4. Site accessibility

The correct answer is: Compliance with all applicable codes

At a final inspection, the inspector is tasked with checking for compliance with all applicable codes. This is crucial because the purpose of the final inspection is to ensure that the construction project adheres to the established safety, zoning, and building regulations. Compliance means that all aspects of the construction—from structural integrity to plumbing and electrical systems—must meet the standards set forth by local building codes. While the quality of construction materials, payment of permit fees, and site accessibility are important aspects of a construction project, they are not the primary focus during the final inspection. Quality of materials is typically dealt with earlier in the process, and payment of permit fees is generally confirmed prior to the issuance of the permit itself. Site accessibility might be assessed, but ensuring compliance with the applicable codes is the overarching priority of the final inspection, as it directly relates to the safety and legality of the completed work.